Clean Water, Sewage, and Industrial Fluids: One Pumping Concept, Very Different Systems

Pumping projects can seem easy on paper. Water flows into one place and is required to move to another. In real life the distance between these two points can be affected by changes in flow rates, elevation variations as well as solids, pressure requirements, storage capacity, control electrical equipment, maintenance access and site restrictions.

Romtec Utilities begins the design of the pumping station with defining these operating conditions, rather than selecting the equipment from the catalog. The preliminary designs and budgetary data can then be developed around what the project actually requires.

Image credit: romtecutilities.com

Start With One Question How are We Moving?

The technology is changed immediately.

The flow of domestic sewage is subject to significant fluctuations throughout the day. If gravity conveyance fails, or isn’t sufficient the wastewater lift station will be required to move the wastewater. Engineers need to consider the expected inflow and peak conditions, pumping capacities Wet-well behavior, discharge specifications, and how the equipment will be maintained and operated.

Industrial water has its own challenges. The fluids used in manufacturing or processing facility might require caustic or oily, or heated to high temperatures or pressure. Romtec Utilities designs industrial systems that can be used for everything from food processing and power generation to data centers, pharmaceutical waste, and oil and gas plants.

Rainfall creates a completely different Operating Cycle

Stormwater systems are usually inactive for long stretches of time but then suddenly they face an enormous volume of water during the course of a storm.

A stormwater liftstation associated with an existing detention basin should in particular, function alongside the overall drainage plan of the area. The runoff is absorbed into the basin. The temporary storage controls the volume immediately. The pumping system takes the water it collects to an outlet that is approved.

Romtec Utilities offered this type of solution to an Norco, California business park. The project required a pumping system to discharge a basin of detention into the public stormwater system. The station needed to be constructed as part of the development’s drainage infrastructure instead of being viewed as isolated equipment.

“Package Doesn’t Signify “Off the Shelf”

A common misconception is that a package pumping system is simply a predetermined collection of components.

In the case of engineered infrastructure, packaging could also mean coordinating the most important pieces of equipment into a specific project. Controls, pumps and meters and components for structural construction and equipment, are able to be picked depending on the conditions of use.

It is particularly useful in connecting a brand new system to the existing infrastructure. The industrial plants and the existing municipal facilities might not provide a lot of space for installation or clear conditions. Equipment might need to be positioned within existing structures, piping electric systems, as well as operational plans.

Capacity planning is a real issue

If facilities grow over the years, undersizing can be very costly.

At Portland International Airport, Romtec Utilities designed and supplied an sewer interceptor lift station to support the PDX Next expansion. The new station is designed to double the peak-flow capability of the current system as airport facilities grow.

This case illustrates a fundamental engineering concept: Design conditions shouldn’t be restricted to what a facility can manage on the typical afternoon. Engineers should also understand the impact of the peak of demand.

The job isn’t finished until the Equipment is delivered

Then, drawings and calculations need to be transformed into an operating system. Documentation and coordination of installation are crucial to the long-term success of.

What happens after the building of a pumping unit determines its quality. The decisions made during initial design are evident when the pump needs to be maintained as flows rise or when a storm hits.

Romtec Utilities incorporates these options into a pumping solution that is tailored to a specific project. This allows the transformation of individual equipment into a system designed for the conditions they will have to face.